Loading
ホームデータベースアイテム #464650

Fate/Apocrypha - Jeanne d'Arc - 1/8 (Max Factory)Fate/Apocrypha - Jeanne d'Arc - 1/8 (Max Factory)

Fate/Apocrypha - Jeanne d'Arc - 1/8 (Max Factory)
カテゴリー
オリジナル
キャラクター
アーティスト
原材料
スケール & サイズ
1/8  H=190mm (7.41in, 1:1=1.52m)
発売日
08/2018 As Standard
価格
¥18,333 変換 USD

購入

コメント250

0pt
Available for pre-order @ Solaris Japan

Pre-Order at Solaris Japan!
└ Check product page for details.
1pt
Moro (13時間前) #34635145lmao called it.

congratulations
2時間前
2pt
lmao called it. More annoying than expected. August is on track to be my most expensive month on record between her and Attila.
13時間前
1pt
Elise_Grimwald (2日前) #34535186I expected it, too, but I figured on July or June. August is awful for me, too. I have the Formal Craft scale, the Astolfo and Mordred nendos, and I think the Scathatch figma. I did not expect the most expensive figure I ordered to be delayed to the worst month outside of September (September is only bad because I also ordered the Nero scale), so this sucks. :/. The only one who'll likely be delayed is the Formal Craft scale, and even then, there's no saying if they will or won't. I just have to absolutely NOT spend the money I had budgeted for her this month, I guess, but I would still love to just pay for her and be done. :/. Hopefully, the place you ordered from does allow you to pay in advance. I wish my place would. It's gonna be REALLY hard to keep the budget I have for this figure.
At least you paid for Attila already, that's something. :). But this still sucks.
I wonder why August, though? it does seem like a lot of figures in general get delayed til August.

NY allows you to pay whenever you want if you used their pay later option which is a fantastic option to have

I was going to pay this figure here in May but i have been saving up for an Oppo UDP-203 4K Blu-Ray player ever since it was announced back in April that Oppo would be going out of business and stop making Blu-Ray players

Had some money saved up and sold almost a third of my figures (all the prize and the old figures) because an Oppo UDP-203 is $1100 US here and i did not had that kind of money laying around

Ordered one but since it has to come all the way from the factory and then to the new Oppo distributor in Germany which then has to ship to Denmark it will take a while

Also ordered a region free chip but that only took about a week so now i have the chip but no player to install it in

Wont get it untill the middle of June and untill then i cant really spend any money

A damm shame they stopped making them!
www.oppodigital...

Might pay the figure in June otherwise it will be July
2日前
1pt
shilka (2日前) #34519481The delay was excepted but August is the worst month of the whole year for me as i already have 3 pre orders that month
Guess i just have to pay it in july instead otherwise i wont be able to eat
No way to know if any of the 3 orders in August will be delayed or not
The Attila figure from GSC is also delayed to August so it seems like everything comes out in August but at least i already paid for that one


I expected it, too, but I figured on July or June. August is awful for me, too. I have the Formal Craft scale, the Astolfo and Mordred nendos, and I think the Scathatch figma. I did not expect the most expensive figure I ordered to be delayed to the worst month outside of September (September is only bad because I also ordered the Nero scale), so this sucks. :/. The only one who'll likely be delayed is the Formal Craft scale, and even then, there's no saying if they will or won't. I just have to absolutely NOT spend the money I had budgeted for her this month, I guess, but I would still love to just pay for her and be done. :/. Hopefully, the place you ordered from does allow you to pay in advance. I wish my place would. It's gonna be REALLY hard to keep the budget I have for this figure.
At least you paid for Attila already, that's something. :). But this still sucks.
I wonder why August, though? it does seem like a lot of figures in general get delayed til August.
2日前
1pt
August is indeed a really bad month but like all the PO I have in August will probably also be delayed
2日前
1pt
Elise_Grimwald (3日前) #34487058Wow, this figure has a much worse delay than expected. In a really bad month, too. :/. I get to keep the money this month, but I have to keep it extra months and try not to use it. :(. Hopefully, she'll be worth it.
The delay was excepted but August is the worst month of the whole year for me as i already have 3 pre orders that month

Guess i just have to pay it in july instead otherwise i wont be able to eat
No way to know if any of the 3 orders in August will be delayed or not

The Attila figure from GSC is also delayed to August so it seems like everything comes out in August but at least i already paid for that one
2日前
2pt
Wow, this figure has a much worse delay than expected. In a really bad month, too. :/. I get to keep the money this month, but I have to keep it extra months and try not to use it. :(. Hopefully, she'll be worth it.
3日前
0pt
Available for pre-order @ Ninoma (MFC Partner) (¥22,805)

Product page : www.ninoma.com/...
Official new item , shipped worldwide from Japan
About 203 USD | 171 EUR | 253 CAD
さらにコメントを見る